Project
Midland Highway, Castlemaine
Pedestrian Operated Signals
Location:
Castlemaine, VIC
Client:
Department of Transport
Scope of Works:
- Full site establishment and traffic management under live arterial conditions
- Demolition of existing footpaths, pram ramps, and traffic islands
- Excavation and subgrade preparation
- Construction of new pedestrian refuge and pram ramps with DDA compliance
- Asphalt reinstatement and overlay across footpath and roadway interfaces
- Installation of pedestrian operated signals:
- Conduits, pits, poles, lanterns, detector loops, and cabling
- Controller installation, testing, and commissioning
- Drainage structure adjustments and kerb realignment
- Signage installation and new line marking
- Site reinstatement, cleanup, and as-built documentation
Highlights
- Pedestrian infrastructure upgrade on a busy regional arterial
- Delivered within constrained site boundaries and sloped terrain
- Seamless integration with existing road geometry and pedestrian facilities
- Fully compliant with VicRoads standards and DDA requirements










