Project
Coburns Road and Centenary Avenue, Melton
Roundabout Construction
Location:
Melton, VIC
Client:
Melton City Council
Scope of Works:
- Intersection upgrade at Coburns Road and Centenary Avenue including pavement reconstruction and traffic calming infrastructure
- Construction of flat-top road humps compliant with PTV standards
- Realignment of footpaths including new pram crossings and pedestrian accessibility upgrades
- Kerb reconstruction including SM2, SM3 and B2 kerb profiles with tie-ins to existing infrastructure
- Drainage upgrades including pit modifications, stormwater improvements and service adjustments
- Relocation and modification of bus stop infrastructure in accordance with PTV standards
- Installation of signage, line marking, RRPMs and traffic control measures
- Asphalt pavement works including full depth asphalt and resurfacing treatments
- Service protection and adjustments including water, gas, electrical, sewer and telecommunications interfaces
- Tree removals, reinstatement works and landscaping reinstatement within the limits of works
Highlights
- Delivered within a live traffic environment requiring staged construction and coordination with public transport infrastructure
- Complex service environment with multiple underground utilities requiring careful planning and depth management
- Integration with existing roundabout infrastructure and surrounding road network
- Improved pedestrian safety through accessible crossings, TGSI installations and traffic calming measures
- Demonstrated Enoch Civil’s capability in delivering compliant council infrastructure upgrades under constrained urban conditions












